2016 - Volume #40, Issue #1, Page #38
Sample Stories From This Issue | List of All Stories In This Issue]

    «Previous    Next»
“Single Pour” Floor Eliminates Need For Separate Foundation
Matt Eby saved time and money when building a new workshop by drilling holes for concrete piers and filling them with concrete at the same time as he poured the floor. When complete, the slab floor and in-ground columns were one solid base.
    “It was a lot cheaper than a traditional foundation,” says Eby. “A..........


  You must sign in, subscribe or renew to see the page.


   You must sign in, subscribe or renew to see the flip-book



To read the rest of this story, download this issue below or click here to register with your account number.
Order the Issue Containing This Story
2016 - Volume #40, Issue #1